Empty Boxes Problem

  •  

    A toothpaste factory had a problem: they sometimes shipped empty boxes, without the tube inside. This was due to the way the production line was set up, and people with experience in designing production lines will tell you how difficult it is to have everything happen with timings so precise that every single unit coming out of it is perfect 100% of the time. Small variations in the environment (which can't be controlled in a cost-effective fashion) mean you must have quality assurance checks smartly distributed across the line so that customers all the way down to the supermarket don't get pissed off and buy another product instead.

    Understanding how important that was, the CEO of the toothpaste factory got the top people in the company together and they decided to start a new project, in which they would hire an external engineering consultant to solve their empty boxes problem, as the in-house engineering department was already too stretched to take on any extra effort.

    The project followed the usual process: budget and project sponsor allocated, RFP, third-parties selected, and six months (and $8 million) later they had a fantastic solution - on time, on budget, high quality and everyone in the project had a great time. They solved the problem by using high-tech precision scales that would sound a bell and flash lights whenever a toothpaste box would weigh less than it should. The line would stop, and someone had to walk over and yank the defective box out of it, pressing another button when done to re-start the line.

    A while later, the CEO decides to have a look at the ROI of the project: amazing results! No empty boxes ever shipped out of the factory after the scales were put in place. Very few customer complaints, and they were gaining market share.

    "That's some money well spent!" he says to himself, before looking closely at the other statistics in the report. It turns out the number of defects picked up by the scales was 0 after three weeks of production use. It should've been picking up at least a dozen a day, so maybe there was something wrong with the report. He filed a bug against it, and after some investigation, the engineers come back saying the report was actually correct. The scales really weren't picking up any defects, because all boxes that got to that point in the conveyor belt were good.

    Puzzled, the CEO travels down to the factory, and walks up to the part of the line where the precision scales were installed. A few feet before the scale, there was a $20 desk fan, blowing the empty boxes out of the belt and into a bin.

    "Oh, that," says one of the workers. "One of the guys put it there 'cause he was tired of walking over every time the bell rang."
  • Household Chores One afternoon a man came home from work to find total chaos in his house. All three children were outside, still in their pyjamas, playing in the mud, with empty food boxes and wrappers thrown all about the front yard..
  • Helpful Neighbor A man is in court. The Judges says, "on the 3rd August you are accused of killing your wife by beating her to death with a hammer, how do you plead?"
    "Guilty," said the man in the dock...
  • Q&A - Love and Marriage HOW DO YOU DECIDE WHO TO MARRY?
    You got to find somebody who likes the same stuff. Like, if you like sports, she should like it that you like sports, and she should keep...
  • Drunk Driving Late one Friday night, a policeman spotted a man driving very erratically through the streets. He pulled the man over and asked him if he had been drinking that evening. "Yes, I have. It`s Friday...
  • Golf Rider Four old geezers came into the pro shop after playing 18 holes and were exhausted. The pro asked if they had a good game and the first old guy said, "Pretty good. I had three riders today...
ADVERTISEMENT
ADVERTISEMENT